coincheck
Launch ledger · published methodology · no paid placement

Deployer HbcPqaeg…tfmLis

This wallet launched 14 token(s) in our ledger. 0 graduated from the bonding curve, a 0.00% graduation rate.

View on Solscan

Record

WalletHbcPqaegi1quR3ovNVWRmsfzk8gU1QbhEQL2fGtfmLis
Launches observed14
Graduated0
Graduation rate0.00%
Best multiple—

A deployer with several launches has a measurable graduation rate, which is more informative than a single launch. A deployer with one launch has a rate of either 0% or 100% and tells you nothing.

Recent launches

The wallet's most recent 14 launches, biggest move first. Most launches never leave the bonding curve, so a list of only the winners would misrepresent the record.

LaunchMultiple PeakOutcome
9LHFefc4bX9.2x$19,713no
BILLY2.9x$12,260no
5fFNHNiSE11.7x$3,663no
REAL ONE1.2x$2,657no
The Runner1.1x$5,238no
REAL ONE1.1x$2,363no
REAL ONE1.0x$2,157no
REAL ONE1.0x$2,157no
REAL ONE1.0x$2,214no
REAL ONE1.0x$2,159no
REAL ONE1.0x$2,157no
REAL ONE0.0x$0no

0 of these 14 graduated. Every one has its own launch record in the ledger.

Graduated launches

TokenMultiplePeak
No graduated launches recorded.

What a graduation rate does not tell you

A high rate means this wallet is good at getting projects to clear the curve. It is not evidence of a good project, not an audit of the contracts, and not a guarantee that anyone who buys can sell. Most launches never graduate, so a creator who graduates two of three is still leaving two tokens stranded on the curve.

It also cannot see a deployer who uses a fresh wallet per launch, which is the cheapest way to avoid a history. Cross-chain wallet clustering would address that and is not built.

What these numbers are. CoinCheck's 94.6% aggregate is a bonding-curve graduation predictor over 79,519 resolved calls. It is not a rug-detection accuracy rate, and the bullish bucket scores 1%.

What graduation is not. Leaving the bonding curve means a token got enough buying interest to clear a low bar. It is not a safety endorsement, and a deployer who graduates often is not thereby running a good project.

Independence. No paid promotion. No ranking is bought.