coincheck
Launch ledger · published methodology · no paid placement

Deployer DMT3DnnW…DK1JxQ

This wallet launched 436 token(s) in our ledger. 0 graduated from the bonding curve, a 0.00% graduation rate.

View on Solscan

Record

WalletDMT3DnnW4apdgYBZN9mfPhRL7nzFwHfC3bnmZMDK1JxQ
Launches observed436
Graduated0
Graduation rate0.00%
Best multiple—

A deployer with several launches has a measurable graduation rate, which is more informative than a single launch. A deployer with one launch has a rate of either 0% or 100% and tells you nothing.

Recent launches

The wallet's most recent 436 launches, biggest move first. Most launches never leave the bonding curve, so a list of only the winners would misrepresent the record.

LaunchMultiple PeakOutcome
Chinese Lab Monkey14.1x$100,356no
dexscrenor4.4x$9,387no
Goy4.2x$16,468no
9hF6GRJsff3.5x$7,521no
nigga i need wheels3.1x$13,572no
The Great Onboarding2.5x$15,914no
monkeys2.1x$13,858no
Elon Must ETF2.1x$13,804no
Hoodless2.0x$6,353no
LiquidWhalePerpLeverageYield4202.0x$8,264no
Pair2.0x$7,336no
Trump the clown2.0x$6,129no

0 of these 436 graduated. Every one has its own launch record in the ledger.

Graduated launches

TokenMultiplePeak
No graduated launches recorded.

What a graduation rate does not tell you

A high rate means this wallet is good at getting projects to clear the curve. It is not evidence of a good project, not an audit of the contracts, and not a guarantee that anyone who buys can sell. Most launches never graduate, so a creator who graduates two of three is still leaving two tokens stranded on the curve.

It also cannot see a deployer who uses a fresh wallet per launch, which is the cheapest way to avoid a history. Cross-chain wallet clustering would address that and is not built.

What these numbers are. CoinCheck's 94.6% aggregate is a bonding-curve graduation predictor over 79,519 resolved calls. It is not a rug-detection accuracy rate, and the bullish bucket scores 1%.

What graduation is not. Leaving the bonding curve means a token got enough buying interest to clear a low bar. It is not a safety endorsement, and a deployer who graduates often is not thereby running a good project.

Independence. No paid promotion. No ranking is bought.