coincheck
Launch ledger · published methodology · no paid placement

Deployer AGtQ7MwB…345Fti

This wallet launched 20 token(s) in our ledger. 0 graduated from the bonding curve, a 0.00% graduation rate.

View on Solscan

Record

WalletAGtQ7MwBK5rzyNR6Ks55PPxsLk3GPZSWB8BUEk345Fti
Launches observed20
Graduated0
Graduation rate0.00%
Best multiple—

A deployer with several launches has a measurable graduation rate, which is more informative than a single launch. A deployer with one launch has a rate of either 0% or 100% and tells you nothing.

Recent launches

The wallet's most recent 20 launches, biggest move first. Most launches never leave the bonding curve, so a list of only the winners would misrepresent the record.

LaunchMultiple PeakOutcome
zolana needs a runner2.1x$12,359no
Angel Dust1.6x$4,795no
billboard guy1.1x$3,389no
solana forever i love you1.1x$5,803no
Encrypt The Memes1.0x$2,980no
mirage munny mode 1.0x$3,023no
Grok1.0x$3,125no
hope you guys are ready 1.0x$2,974no
Zolana $ZCAT1.0x$2,963no
.1.0x$2,959no
WOW1.0x$2,962no
Boner Coin1.0x$2,960no

0 of these 20 graduated. Every one has its own launch record in the ledger.

Graduated launches

TokenMultiplePeak
No graduated launches recorded.

What a graduation rate does not tell you

A high rate means this wallet is good at getting projects to clear the curve. It is not evidence of a good project, not an audit of the contracts, and not a guarantee that anyone who buys can sell. Most launches never graduate, so a creator who graduates two of three is still leaving two tokens stranded on the curve.

It also cannot see a deployer who uses a fresh wallet per launch, which is the cheapest way to avoid a history. Cross-chain wallet clustering would address that and is not built.

What these numbers are. CoinCheck's 94.6% aggregate is a bonding-curve graduation predictor over 79,519 resolved calls. It is not a rug-detection accuracy rate, and the bullish bucket scores 1%.

What graduation is not. Leaving the bonding curve means a token got enough buying interest to clear a low bar. It is not a safety endorsement, and a deployer who graduates often is not thereby running a good project.

Independence. No paid promotion. No ranking is bought.