coincheck
Launch ledger · published methodology · no paid placement

Deployer 967MpD4S…9X3npe

This wallet launched 12 token(s) in our ledger. 0 graduated from the bonding curve, a 0.00% graduation rate.

View on Solscan

Record

Wallet967MpD4SjUJd2NUvZ3DDbturuNjXAHs6Wi6HXN9X3npe
Launches observed12
Graduated0
Graduation rate0.00%
Best multiple—

A deployer with several launches has a measurable graduation rate, which is more informative than a single launch. A deployer with one launch has a rate of either 0% or 100% and tells you nothing.

Recent launches

The wallet's most recent 12 launches, biggest move first. Most launches never leave the bonding curve, so a list of only the winners would misrepresent the record.

LaunchMultiple PeakOutcome
angstipan1.3x$4,026no
Garfield1.0x$2,860no
Mr. Mailbox1.0x$2,987no
he tryna ignore it1.0x$3,035no
The world's laziest cat1.0x$2,691no
Dream Family1.0x$2,733no
catonfone1.0x$2,826no
Sunset Cat1.0x$2,851no
Strappy1.0x$3,035no
BLEPCAT1.0x$2,910no
Catonfone1.0x$2,898no
PUMPCAT1.0x$2,902no

0 of these 12 graduated. Every one has its own launch record in the ledger.

Graduated launches

TokenMultiplePeak
No graduated launches recorded.

What a graduation rate does not tell you

A high rate means this wallet is good at getting projects to clear the curve. It is not evidence of a good project, not an audit of the contracts, and not a guarantee that anyone who buys can sell. Most launches never graduate, so a creator who graduates two of three is still leaving two tokens stranded on the curve.

It also cannot see a deployer who uses a fresh wallet per launch, which is the cheapest way to avoid a history. Cross-chain wallet clustering would address that and is not built.

What these numbers are. CoinCheck's 94.6% aggregate is a bonding-curve graduation predictor over 79,519 resolved calls. It is not a rug-detection accuracy rate, and the bullish bucket scores 1%.

What graduation is not. Leaving the bonding curve means a token got enough buying interest to clear a low bar. It is not a safety endorsement, and a deployer who graduates often is not thereby running a good project.

Independence. No paid promotion. No ranking is bought.