coincheck
Launch ledger · published methodology · no paid placement

Deployer 8SQJ9Pc8…WfMcto

This wallet launched 110 token(s) in our ledger. 0 graduated from the bonding curve, a 0.00% graduation rate.

View on Solscan

Record

Wallet8SQJ9Pc8kryYKWmro7wGX5NRpDp3sxJXoShWy9WfMcto
Launches observed110
Graduated0
Graduation rate0.00%
Best multiple—

A deployer with several launches has a measurable graduation rate, which is more informative than a single launch. A deployer with one launch has a rate of either 0% or 100% and tells you nothing.

Recent launches

The wallet's most recent 110 launches, biggest move first. Most launches never leave the bonding curve, so a list of only the winners would misrepresent the record.

LaunchMultiple PeakOutcome
DashHound1.6x$4,575no
SIMP FUN1.5x$4,927no
2nd Bag1.1x$4,548no
GPT-6-SOL-TERRA-LUNA1.1x$3,016no
NO PAID1.0x$2,973no
Fee Me1.0x$2,952no
Cog is a Kitty Dog1.0x$2,750no
iShowZpeed1.0x$2,743no
kittyDog1.0x$2,768no
The Rake1.0x$2,794no
Money Printer1.0x$2,807no
SEND 5001.0x$2,861no

0 of these 110 graduated. Every one has its own launch record in the ledger.

Graduated launches

TokenMultiplePeak
No graduated launches recorded.

What a graduation rate does not tell you

A high rate means this wallet is good at getting projects to clear the curve. It is not evidence of a good project, not an audit of the contracts, and not a guarantee that anyone who buys can sell. Most launches never graduate, so a creator who graduates two of three is still leaving two tokens stranded on the curve.

It also cannot see a deployer who uses a fresh wallet per launch, which is the cheapest way to avoid a history. Cross-chain wallet clustering would address that and is not built.

What these numbers are. CoinCheck's 94.6% aggregate is a bonding-curve graduation predictor over 79,519 resolved calls. It is not a rug-detection accuracy rate, and the bullish bucket scores 1%.

What graduation is not. Leaving the bonding curve means a token got enough buying interest to clear a low bar. It is not a safety endorsement, and a deployer who graduates often is not thereby running a good project.

Independence. No paid promotion. No ranking is bought.