coincheck
Launch ledger · published methodology · no paid placement

Deployer 5iv9uQfS…6XYj3a

This wallet launched 63 token(s) in our ledger. 1 graduated from the bonding curve, a 1.59% graduation rate.

View on Solscan

Record

Wallet5iv9uQfSKTzpAdJkQzBRPWKSLZ1kEnWkk6VvR16XYj3a
Launches observed63
Graduated1
Graduation rate1.59%
Best multiple18.4x

A deployer with several launches has a measurable graduation rate, which is more informative than a single launch. A deployer with one launch has a rate of either 0% or 100% and tells you nothing.

Recent launches

The wallet's most recent 63 launches, biggest move first. Most launches never leave the bonding curve, so a list of only the winners would misrepresent the record.

LaunchMultiple PeakOutcome
Subjugated 18.4x$141,766graduated
Dino9.6x$16,061no
Maythem .198.3x$24,092no
meme5.4x$7,042no
nano5.4x$11,451no
Last developments 24.3x$5,995no
1M4.3x$4,695no
LOSe4.3x$36,585no
subjects 3.8x$7,759no
Lost Access 3.3x$7,005no
DOWN2.9x$6,136no
EXIT2.5x$2,716no

1 of these 63 graduated. Every one has its own launch record in the ledger.

Graduated launches

TokenMultiplePeak
Subjugated 18.4x$141,766

What a graduation rate does not tell you

A high rate means this wallet is good at getting projects to clear the curve. It is not evidence of a good project, not an audit of the contracts, and not a guarantee that anyone who buys can sell. Most launches never graduate, so a creator who graduates two of three is still leaving two tokens stranded on the curve.

It also cannot see a deployer who uses a fresh wallet per launch, which is the cheapest way to avoid a history. Cross-chain wallet clustering would address that and is not built.

What these numbers are. CoinCheck's 94.6% aggregate is a bonding-curve graduation predictor over 79,519 resolved calls. It is not a rug-detection accuracy rate, and the bullish bucket scores 1%.

What graduation is not. Leaving the bonding curve means a token got enough buying interest to clear a low bar. It is not a safety endorsement, and a deployer who graduates often is not thereby running a good project.

Independence. No paid promotion. No ranking is bought.