coincheck
Launch ledger · published methodology · no paid placement

Deployer 5VbkCEq6…WcpZwr

This wallet launched 172 token(s) in our ledger. 2 graduated from the bonding curve, a 1.16% graduation rate.

View on Solscan

Record

Wallet5VbkCEq6ansMvPXwKgRJKQqvc4WHqiTsDYss4AWcpZwr
Launches observed172
Graduated2
Graduation rate1.16%
Best multiple26.8x

A deployer with several launches has a measurable graduation rate, which is more informative than a single launch. A deployer with one launch has a rate of either 0% or 100% and tells you nothing.

Recent launches

The wallet's most recent 172 launches, biggest move first. Most launches never leave the bonding curve, so a list of only the winners would misrepresent the record.

LaunchMultiple PeakOutcome
GIFTR26.8x$44,103graduated
GIFTR16.3x$75,441graduated
GIFTR7.4x$15,727no
GIFTR6.7x$112,414no
GIFTR5.7x$6,713no
GIFTR5.3x$11,346no
GIFTR5.0x$16,522no
GIFTR5.0x$12,210no
GIFTR4.8x$10,078no
GIFTR4.6x$11,097no
GIFTR4.5x$7,375no
GIFTR4.2x$19,196no

2 of these 172 graduated. Every one has its own launch record in the ledger.

Graduated launches

TokenMultiplePeak
GIFTR26.8x$44,103
GIFTR16.3x$75,441

What a graduation rate does not tell you

A high rate means this wallet is good at getting projects to clear the curve. It is not evidence of a good project, not an audit of the contracts, and not a guarantee that anyone who buys can sell. Most launches never graduate, so a creator who graduates two of three is still leaving two tokens stranded on the curve.

It also cannot see a deployer who uses a fresh wallet per launch, which is the cheapest way to avoid a history. Cross-chain wallet clustering would address that and is not built.

What these numbers are. CoinCheck's 94.6% aggregate is a bonding-curve graduation predictor over 79,519 resolved calls. It is not a rug-detection accuracy rate, and the bullish bucket scores 1%.

What graduation is not. Leaving the bonding curve means a token got enough buying interest to clear a low bar. It is not a safety endorsement, and a deployer who graduates often is not thereby running a good project.

Independence. No paid promotion. No ranking is bought.