This wallet launched 22 token(s) in our ledger. 2 graduated from the bonding curve, a 9.09% graduation rate.
View on Solscan| Wallet | 52LB1v8mK6q1vGVHPhGSLwqWc8b2PfSV1erjVPonvift |
|---|---|
| Launches observed | 22 |
| Graduated | 2 |
| Graduation rate | 9.09% |
| Best multiple | 14.2x |
A deployer with several launches has a measurable graduation rate, which is more informative than a single launch. A deployer with one launch has a rate of either 0% or 100% and tells you nothing.
The wallet's most recent 22 launches, biggest move first. Most launches never leave the bonding curve, so a list of only the winners would misrepresent the record.
| Launch | Multiple | Peak | Outcome |
|---|---|---|---|
| GLOP | 14.2x | $30,345 | graduated |
| GRADELESS | 10.3x | $16,935 | graduated |
| ODD COIN | 6.1x | $11,730 | no |
| Doomed Rocket | 5.8x | $12,371 | no |
| SPONGEMOCKING | 5.7x | $6,590 | no |
| LMAO | 5.6x | $52,865 | no |
| Freaky ah | 5.0x | $22,481 | no |
| GRADELESS | 4.6x | $24,042 | no |
| GRADELESS | 4.4x | $13,233 | no |
| ALICE | 4.0x | $8,519 | no |
| Doomed Yeti | 3.2x | $6,931 | no |
| goat coin | 2.2x | $2,797 | no |
2 of these 22 graduated. Every one has its own launch record in the ledger.
A high rate means this wallet is good at getting projects to clear the curve. It is not evidence of a good project, not an audit of the contracts, and not a guarantee that anyone who buys can sell. Most launches never graduate, so a creator who graduates two of three is still leaving two tokens stranded on the curve.
It also cannot see a deployer who uses a fresh wallet per launch, which is the cheapest way to avoid a history. Cross-chain wallet clustering would address that and is not built.
What these numbers are. CoinCheck's 94.6% aggregate is a bonding-curve graduation predictor over 79,519 resolved calls. It is not a rug-detection accuracy rate, and the bullish bucket scores 1%.
What graduation is not. Leaving the bonding curve means a token got enough buying interest to clear a low bar. It is not a safety endorsement, and a deployer who graduates often is not thereby running a good project.
Independence. No paid promotion. No ranking is bought.