coincheck
Launch ledger · published methodology · no paid placement

Deployer 3xVBDFhF…DnbMa9

This wallet launched 73 token(s) in our ledger. 0 graduated from the bonding curve, a 0.00% graduation rate.

View on Solscan

Record

Wallet3xVBDFhFtvDoS9EnwnCZA5meTGGAn3pgrjFnn7DnbMa9
Launches observed73
Graduated0
Graduation rate0.00%
Best multiple—

A deployer with several launches has a measurable graduation rate, which is more informative than a single launch. A deployer with one launch has a rate of either 0% or 100% and tells you nothing.

Recent launches

The wallet's most recent 73 launches, biggest move first. Most launches never leave the bonding curve, so a list of only the winners would misrepresent the record.

LaunchMultiple PeakOutcome
DOY5.5x$15,613no
LOB4.4x$12,567no
Abstract Laptop3.7x$10,790no
HardRock3.2x$9,139no
Fu Fung3.1x$8,899no
Tiktok 2.8x$8,003no
LOB2.8x$19,373no
LimeGuy2.5x$7,370no
Carrot Cake2.4x$6,736no
Raindrop2.2x$6,361no
Wasp Man2.2x$6,275no
Tree of Profits2.0x$4,267no

0 of these 73 graduated. Every one has its own launch record in the ledger.

Graduated launches

TokenMultiplePeak
No graduated launches recorded.

What a graduation rate does not tell you

A high rate means this wallet is good at getting projects to clear the curve. It is not evidence of a good project, not an audit of the contracts, and not a guarantee that anyone who buys can sell. Most launches never graduate, so a creator who graduates two of three is still leaving two tokens stranded on the curve.

It also cannot see a deployer who uses a fresh wallet per launch, which is the cheapest way to avoid a history. Cross-chain wallet clustering would address that and is not built.

What these numbers are. CoinCheck's 94.6% aggregate is a bonding-curve graduation predictor over 79,519 resolved calls. It is not a rug-detection accuracy rate, and the bullish bucket scores 1%.

What graduation is not. Leaving the bonding curve means a token got enough buying interest to clear a low bar. It is not a safety endorsement, and a deployer who graduates often is not thereby running a good project.

Independence. No paid promotion. No ranking is bought.